Citation: | LUO Zhiyong, ZHU Zihao, YOU Bo, LIU Jiahui. Virtual Workflow Constrained Time-accuracy Optimization Algorithm Scheduling by Iterative Reduction[J]. Journal of Electronics & Information Technology, 2018, 40(8): 2013-2019. doi: 10.11999/JEIT171038 |
DE P, DUNNE E J, GHOSH J B, et al. Complexity of the discrete time-cost trade-off problem for project networks[J]. Operations Research, 1997, 45(2): 302-306. doi: 10.1287/ opre.45.2.302.
|
KUMAR A, DIJKMAN R, and SONG M. Optimal resource assignment in workflows for maximizing cooperation[C]. 11th International Conference, BPM 2013, Beijing, China, 2013: 26-30. doi: 10.1007/978-3-642-40176-3_20.
|
BUYYA R, GIDDY J, and ABRAMSON D. An evaluation of economy-based resource trading and scheduling on computational power grids for parameter sweep applications [C]. Proceedings of the 2nd International Workshop on Active Middleware Services, Pittsburgh, USA, 2000: 221-230. doi: 10.1007/978-1-4419-8648-1_19.
|
DELDARI A, NAGHIBZADEH M, and ABRISHAMI S. CCA: A deadline-constrained workflow scheduling algorithm for multicore resources on the cloud[J]. The Journal of Supercomputing, 2017, 73(2): 756-781. doi: 10.1007/s11227- 016-1789-5.
|
ALKHANAK E N, LEE S P, REZAEI R, et al. Cost optimization approaches for scientific workflow scheduling in cloud and grid computing: A review, classifications, and open issues[J]. Journal of Systems and Software, 2016, 133: 1-26. doi: 10.1016/j.jss.2015.11.023.
|
VIRIYAPANT K and SMANCHAT S. A deadline- constrained scheduling for dynamic multi-instances parameter sweep workflow[C]. 2016 IEEE/ACIS 15th International Conference on Computer and Information Science (ICIS), Okayama, Japan, 2016: 1-6. doi: 10.1109/ ICIS.2016.7550820.
|
ARABNEJA H, BARBOSA J G, and PRODAN R. Low-time complexity budget-deadline constrained workflow scheduling on heterogeneous resources[J]. Future Generation Computer Systems, 2016, 55: 29-40. doi: 10.1016/j.future.2015.07.021.
|
VERMA A and KAUSHAL S. Cost-time efficient scheduling plan for executing workflows in the cloud[J]. Journal of Grid Computing, 2015, 13(4): 1-12. doi: 10.1007/s10723-015- 9344-9.
|
冯复剑. 时间约束工作流的可调度性分析[J]. 计算机工程与应用, 2016, 52(12): 26-30. doi: 10.3778/j.issn.1002-8331.1511- 0313. FENG Fujian. Schedulability analysis of timing constraint workflows[J]. Computer Engineering and Applications, 2016, 52(12): 26-30. doi: 10.3778/j.issn.1002-8331.1511-0313.
|
武星, 卓少剑, 张武. 成本最优化工作流技术驱动的研发协同软件即服务应用[J]. 计算机集成制造系统, 2013, 19(8): 1748-1754. WU Xing, ZHUO Shaojian, and ZHANG Wu. Cost optimization workflow-driven SssS for collaborative research and development[J]. Computer Integrated Manufacturing Systems, 2013, 19(8): 1748-1754.
|
张佩云, 凤麒. 一种云计算环境下的工作流双向调度算法[J]. 计算机科学, 2015, 42(11): 425-430. ZHANG Peiyun and FENG Qi. Method of workflow bi-directional scheduling in cloud computing environment[J]. Computer Science, 2015, 42(11): 425-430.
|
梁合兰, 杜彦华, 李苏剑. 时序约束下科学工作流的动态调度研究[J]. 系统工程理论与实践, 2015(9): 2410-2421. doi: 10.12011/1000-6788(2015)9-2410. LIANG Helan, DU Yanhua, and LI Sujian. Research on dynamic scheduling of scientific workflows with temporal constraints [J]. Systems Engineering-Theory Practice, 2015(9): 2410-2421. doi: 10.12011/1000-6788(2015)9-2410.
|
曹斌, 王小统, 熊丽荣, 等. 时间约束云工作流调度的粒子群搜索方法[J]. 计算机集成制造系统, 2016, 22(2): 372-380. CAO Bin, WANG Xiaotong, XIONG Lirong, et al. Searching method for particle swarm optimization of cloud workflow scheduling with time constraint[J]. Computer Integrated Manufacturing Systems, 2016, 22(2): 372-380.
|
刘中金, 卓子寒, 何跃鹰, 等. 一种基于动态配额的虚拟网带宽公平调度算法[J]. 电子与信息学报, 2016, 38(10): 2654-2659. doi: 10.11999/JEIT151485. LIU Zhongjin, ZHUO Zihan, HE Yaoying, et al. Dynamical weighted scheduling algorithm supporting fair bandwidth allocation of virtual networks[J]. Journal of Electronics Information Technology, 2016, 38(10): 2654-2659. doi: 10.11999/ JEIT151485.
|